#1, Survey No. 34,
Mandur-Devanahalli Road, Mandur Village, Bidarahalli Hobli,
Bangalore- 560049
With this gantry system, a space problem was solved with a simple trick: there was only 20cm of installation height available for the cable guidance, too low for a conventional energy chain. But lying on its side, the space is sufficient. However, it was only possible with the simultaneous installation of a supporting stacker module including a traversing trough on the CNC gantry. This allows the gantry to reach travel speeds of up to 15 metres per minute.