#1, Survey No. 34,
Mandur-Devanahalli Road, Mandur Village, Bidarahalli Hobli,
Bangalore- 560049
In the large sewage treatment plant in Plauen, our basic flizz system reliably supplies the scraper bridge with energy. It replaces a motorised cable reel, and since then the energy and signal supply of the primary clarifier has been running smoothly. The new system - a ready-to-install combination of energy chain and stainless steel enclosure - was specially developed to meet the requirement profile of sewage treatment plant operations.
Now a solution had to be found for the energy supply of the mobile scraper of a clarification basin. The Aggerverband decided against the conventional solution with cable drum and in favour of an energy supply system from the lbt flizz® system. The result: the system at the sewage treatment plant has been working without failures since 2000.
Anyone travelling to Antwerp by car will see it from afar on the motorway: the world's largest polymer energy chain, the E4.350 from igus. At a silt-processing plant near the harbour, the e-chain runs on a huge arch-shaped bridge. The world's largest plastic energy chain to date is used to safely guide the heavy movable hoses on the bridge.