In a dumb deposit company in Belgium, the trailing cables have been replaced in two running
cranes with e-chains® from igus®. This project was related with several challenges: The cranes
need to travel 116 metres; its speed is 2.5 metres per second with an acceleration of 0.5
metres per s². Both cranes are using the same rail, they require therefore two long e-chains®
that are travelling one above the other in the same trough. Trailing cables could hardly manage
such different loads with the consequence of frequent damage and production losses. igus®
delivered the perfect solution: The cable length could be on one
hand shortened by completely pre-assembled e-chains® from the
product line readychain® and on the other hand the life time is
increased.
TCS nv, Hakan Tiren, Houthalen-Helchteren, Belgium